#325 – LESSONS LEARNED VIA GOLDEN NUGGETS – FRED SCHENKELBERG

Featured

One of the enjoyable parts of reliability engineering work is the consistent need to learn. We learn how new materials, designs, applications, and systems work, and fail. Sometimes we learn through proactive characterization studies, sometimes via unwanted field failures.

Failures will occur, it is what we learn from them that matters. The ability to gather and remember the lessons learned is a common and ongoing need for every organization. We are not very good at it, in general. Continue reading

#324 – SUPPLY CHAIN RISK MANAGEMENT – GREG HUTCHINS PE CERM

Featured

Almost daily, we hear of some problem in the supply chain. A few weeks ago, a container ship got stuck in the Suez Canal and hundreds of ships were backed up with no place to go. As well, original equipment manufacturers in Europe missed critical parts because of their Just in Time delivery practices. Continue reading

#324 – IMPROVING RELIABILITY WITH GOOD JUDGMENT – FRED SCHENKELBERG

Featured

At an early concept meeting discussing the technical strategy for the new product, the engineering teams were at an impasse. The decision matrix balanced out with three distinct options. Product reliability differed slightly with each option yet presented risks just as the considerations of cost, complexity, feature set, and time to market.

The project manager, the leader of the development program, asked a few questions, asked for input from the director of engineering, and selected a path forward. Continue reading

#323 – BEST PRACTICES TO DEALING WITH FIELD FAILURES – FRED SCHENKELBERG

Featured

A common practice I’ve seen in organizations is to deal with field failures when they occur. This may occur when the mistaken assumption that no failure will occur due to ‘such an excellent design.”

Ben Franklin may not have been thinking about future product failures, yet his quote:

By failing to prepare you are preparing to fail.

implies we need to prepare ourselves and our organization to deal with field failures. Having clear processes to deal with field failures is a best practice. Continue reading

#318 – IS MAKING ASSUMPTION SIMILAR TO MAKING MISTAKES – FRED SCHENKELBERG

Featured

Over the past week, I received a couple of interesting questions. One concerned assuming a Weibull beta value for an accelerated life test plan. The second involved assuming expected life models for elements within a reliability block diagram.

In both cases, we faced incomplete data and uncertainties, yet felt the need to assume some values in order for the math to work out. We do make assumptions in order to solve problems. We also can make mistakes that lead to unwanted consequences. Continue reading