#277 – NEW PROJECT FRAMEWORK FOR LONG DURATION PROJECTS – JOHN AYERS

Featured

The Central Artery/Tunnel Project, known as the Big Dig in Boston, originally was planned to take 10 years to complete for a budget of $2.5B. It actually took 30 years and cost $14.8 B.  The traditional project framework used was inadequate for a long duration project. A new project framework, I call Adaptive Rolling Wave, is needed. It is a combination of the Adaptive Project and Rolling Wave framework, that is more suited for a long duration project because it breaks down the project into a number of smaller projects. Continue reading