#122 – METHODS TO ESTIMATE ALT VALUE – FRED SCHENKELBERG

ABC FredHere is an example of how to determine the future value of a specific reliability task. Many of us face the challenge of how to justify spending product development resources to provide insights and information to the rest of the team. Accelerated life testing (ALT) is particularly difficult: It is time consuming, expensive, and at times statistically complex. Having a clear method to estimate the value serves your career and the organization well, as both benefit from the right investments.

ALT AND MARKET SHARE

A design team working on a medical device understands that the market share is related to the product reliability. The current product performs adequately yet has the highest field failure rate of similar products. Customers complain about the poor reliability, and the market share reflects its comparative reliability ranking. The most reliable product is also the one with the highest market share.

The design challenge is to create a product that is more reliable than the competition, at about the same price point, and if possible with improved functionality. The early concepts all include a novel design using an unproven sealing material (in terms of reliability). The uncertainty suggests the implementation of an accelerated life test to estimate the expected product reliability.

Achieving a higher reliability is expected to result in more than tripling the market share in the first year. This would result in sales of the $3,000 unit product jumping from 10,000 per year to approximately 30,000 per year, meaning an additional $60 million in revenue. Furthermore, the increase in sales would require more than doubling the manufacturing capacity, at a cost of $5 million. The decision to increase the manufacturing capacity is dependent on the estimated product reliability. To have the capacity available to meet the expected demand a decision has to be made and the $5 million committed prior to the start of production.

RELIABILITY GOAL AND ALT DISCUSSION

The current product achieves 90% reliability over two years. The best competitive product is estimated to achieve 98% reliability over the same period. The goal for the new design is at least 99% reliability over two years. This is a major goal and simply conducting ALT is not going to achieve the result. Yet, a key element is understanding whether or not the goal has been achieved. The $5 million investment in manufacturing depends on knowing whether or not the design will meet the goal.

In this case ALT can answer the question, as it’s focused on the expected dominant failure mechanism. The failure mechanism and the stresses are all known. The new design using novel material does leave some uncertainty around how the design will actually perform. A well-designed ALT program has the capability of ascertaining the expected reliability performance.

ALT COST

ALT is often expensive to conduct. The test design, samples, product operation jigs (robots, actuators, software, etc.), monitoring equipment, and failure analysis all add to the cost. Let’s assume that the total test planning and setup cost is $50,000.

Demonstrating the high reliability will require a significant number of samples. We can get a rough estimate of the number of samples, s, needed for a test to demonstrate 99% reliability with 90% confidence, assuming no failures of any tested samples, using the following formula:

AAA FRED

where n is the sample size, C is the statistical confidence, and R is the reliability.

The 230 sample number is based on a success testing approach in which the failure mechanism is assumed and the associated stress is well understood. Reducing the sample size with the use of degradation testing or some other method may increase the testing complexity and result in lower overall costs.

The cost of the subsystem that holds the seal is $200 per unit. Then 230 ´ $200 estimates the cost for samples of $46,000. The total cost of ALT is approximately $96,000.

ALT VALUE

In this situation the test results provide a binary result. The population either does or does not achieve at least 99% reliability. Keeping in mind that ALT is run with a sample to represent the population, there is some uncertainty about the results. Statistical error may lead to four outcomes as shown in Table 1.

The unknown actual reliability
is < 99%
Test Result Is TRUE Is FALSE
R ≥ 99% Type I error Correct
R < 99% Correct Type II error

Table 1 Statistical errors

Assuming the test design used 90% confidence and has a 90% power. This means we have a 10% chance of thinking that the reliability is less than it actually is and to not invest in added manufacturing capacity (lost opportunity for increased sales). Further, there is a 10% chance of thinking that the reliability is better than 99% when it is not. The chance the results appear better than what will actually occur may lead us to thus in added capacity when demand will not materialize.

With ALT we have a 50/50 chance that the new material and design will meet the 99% reliability goal. Combining that with the uncertainty of statistical error and a $5 million decision, we can calculate the value of the test.

ALT RETURN ON INVESTMENT

The Return on Investment (ROI) is the ratio of the expected return over the cost. A cost of $4 million divided by $96,000 results in an ROI > 41.

Of course, the $5 million decision isn’t the only factor in the value of ALT. It also provides a baseline for further testing (test cost savings); it may provide information on the amount of margin the design has over the goal and allow further design enhancements. It also confirms the change in reliability, enabling proactive changes in warranty accruals and service and repair operations.

Bio:

Fred Schenkelberg is an experienced reliability engineering and management consultant with his firm FMS Reliability. His passion is working with teams to create cost-effective reliability programs that solve problems, create durable and reliable products, increase customer satisfaction, and reduce warranty costs. If you enjoyed this articles consider subscribing to the ongoing series at Accendo Reliability.