#55 – GM’S ELEPHANT ON THE SHOP FLOOR – WILLIAM A. LEVINSON

LevinsonThe phrase ‘elephant in the living room’ refers to a major problem that everybody knows is there, but nobody wants to acknowledge.  Acknowledging and defining the problem is, of course, the first part of any closed-loop corrective action process.  ‘Problem notification’ and ‘problem identification’ are the first two steps in the Automotive Industry Action Group’s Effective Problem Solving for Practitioners process.

General Motors seems to have forgotten this. Continue reading

#55 – ISO 9001 SYSTEM CHALLENGES – T. DAN NELSON

T. Dan NelsonThe phrase “ISO 9001-based system” can be confusing if ISO 9001 is not understood properly.  It’s not uncommon to hear people use the phrase—including Dr. Nigel Croft (who chairs TC 176).  For example, Dr. Croft recently participated in a ‘hangout’ session where he addressed ISO 9001, its intentions, and its development.  You can see the session in its entirety here (roughly 33 minutes):

https://www.youtube.com/watch? Continue reading

#55 – MANAGE SUPPLY CHAIN RISKS USING ERM – KELLY EISENHARDT

Kelly EisenhardtEvery day we are bombarded with news of politically charged events happening around the world.  Have you ever wondered how these events can affect the products your company develops and the supply chains that help manufacture them?  I’ve worked with many corporations and non-profits over the years and one thing is clear, very few products can claim a supply chain that exists in one country and a “Made In,” label that matches.  Availability, pricing, logistics, and labor are affected by the politics of the country and region from which materials and goods come. Continue reading