#212 – DESIGN ASSUMPTION RISKS – JOHN AYERS

Featured

AAA-150x150Introduction

This story is about risk at the enterprise program/project level.  Design is based on primarily requirements and assumptions.  Meeting requirements is usually achievable if they are complete and clear. Soft or poorly written requirements are the source of cost and schedule growth for many projects. Assumptions made during the analysis or design phase if wrong are also a source of poor project performance. This story is one example of a bad assumption. Continue reading